Project Description

Developed for a farming family to complement their farming practice. Engena screened the project with Angus Council to determine that the project would not require an Environmental Impact Assessment.

An Environmental Report was produced, based upon a series of assessments including landscape, ecology and noise. Our scope of work also included the site design, identification of the access route, and management of the project throughout the determination process and discharge of planning conditions. Particular attention was required with regard to surveys for pink footed geese, due to the proximity of the site to the Montrose Basin.

Consented at local level, through the Officer's delegated authority, the turbine entered operation in December 2014.

Notable Achievements

Pragmatic consideration of ecology to avoid impacts upon pink footed geese.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
49.9MWp Solar Farm, South-West of Barnstaple, Devon
2025

Litchardon Cross Solar Farm

Solar
white diagonal right and up arrow
1.9 MWp Solar Farm, Central Bedfordshire, near to Leighton Buzzard

Double Arches Solar

Solar
white diagonal right and up arrow
Combination of ground and roof mounted Solar Panels totalling 500kWp, Located in the south-west of Aylesbury Vale between Bicester and Aylesbury

Yeat Wood Solar

Solar