Project Description

Developed for a farming family to complement their farming practice. Engena screened the project with Angus Council to determine that the project would not require an Environmental Impact Assessment.

An Environmental Report was produced, based upon a series of assessments including landscape, ecology and noise. Our scope of work also included the site design, identification of the access route, and management of the project throughout the determination process and discharge of planning conditions. Particular attention was required with regard to surveys for pink footed geese, due to the proximity of the site to the Montrose Basin.

Consented at local level, through the Officer's delegated authority, the turbine entered operation in December 2014.

Notable Achievements

Pragmatic consideration of ecology to avoid impacts upon pink footed geese.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
24.8MW Solar Farm, Near Ipswich
2024

Bucklesham Solar

Solar
white diagonal right and up arrow
Six Repower MM92 wind turbines (125m to tip), total capacity of 18MW & One Repower 5M wind turbine (163m to tip), total capacity of 5MW, Blyth Harbour, Northumberland

Wansbeck Blyth Harbour Wind Farm (Blyth Harbour re-powering)

Wind
white diagonal right and up arrow
1.5MW Wind Turbine, 2.1MW Solar Array, 120MWh Battery Energy Storage System and EV Charging Station, Near Leighton Buzzard
2024

Astral Green Energy Park

Wind
Solar
Battery