Project Description

Engena screened the development with Central Bedfordshire Council confirming that the project would not be EIA development.

We then produced an Environmental Report detailing the potential effects of the proposal, coordinating and managing the planning application on behalf of the developer. The scope of work included public consultation and post submission support.

Following a recommendation to approve, the scheme was consented at the local level by Planning Committee, and is now currently under construction.

Notable Achievements

This scheme is located within Green Belt, and therefore comprised inappropriate development. Engena demonstrated very special circumstances associated with renewable energy. The project design was sympathetic to a previously consented quarry restoration ROMP.

Engena subsequently supported the application for a 3MW battery energy storage scheme which was integrated into an Electric Vehicle Charging facility also managed by Engena.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
Five Nordex N80 turbines (100m to tip) incorporated into 42MW Twinshiels Wind Farm., 3 km east of Laurencekirk, Aberdeenshire

Easter Tulloch Wind Farm

Wind
white diagonal right and up arrow
15MW, Rutherford Appleton Laboratory, South Oxfordshire

RAL Solar Array

Solar
white diagonal right and up arrow
Combination of ground and roof mounted Solar Panels totalling 500kWp, Located in the south-west of Aylesbury Vale between Bicester and Aylesbury

Yeat Wood Solar

Solar