Project Description

Engena was pivotal in supporting Hainsforth Energy Blyth Harbour Limited to achieve planning consent for one of the first wind farm re-powering projects in the UK.

Consented at local level, the project involved an Environmental Impact Assessment to replace nine 300kW, 43m to tip turbines, with six 3MW, 125m to tip turbines and one 5MW, 163m to tip turbine.

This remains the UK’s tallest on-shore wind turbine planning consent.

Presently, one of the old turbines has been replaced with a 3.4MW turbine, an increase in capacity from 3.0MW, secured through an amendment to the planning application. The remaining elements of the consent will be completed following security of additional grid capacity.

Notable Achievements

163m consented onshore turbine in an urban/semi offshore environment.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
Single Enercon E44 wind turbine (67m to tip), total capacity of 500kW, Near Brechin, Angus
2014

Whitefield of Dunn

Wind
white diagonal right and up arrow
10MW (4 x 2.5MW) Gas Fuelled Electricity Generators, Port of Felixstowe, Suffolk

Felixstowe Capacity Market Infrastructure

Battery
Alternative
white diagonal right and up arrow
1.5MW Wind Turbine, 2.1MW Solar Array, 120MWh Battery Energy Storage System and EV Charging Station, Near Leighton Buzzard
2024

Astral Green Energy Park

Wind
Solar
Battery