Project Description

As part of a suite of applications prepared for Conrad Energy Limited, Engena provided the full planning application package, including the Planning Statement for a 10MW gas-fired standby generation facility at the Port of Felixstowe.

‍

The generation facility will provide energy at times of peak electricity demand, through the UK Capacity Market. With the decline of large scale fossil-fuelled generation and a significant increase in renewable capacity on the grid, this project addresses the need for standby generation which is brought on-line during times of high consumer demand, and low renewables generation.

Notable Achievements

Careful and precise application preparation to meet the pressing needs of the Capacity Auction process.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
1.5MW Wind Turbine, 2.1MW Solar Array, 120MWh Battery Energy Storage System and EV Charging Station, Near Leighton Buzzard
2024

Astral Green Energy Park

Wind
Solar
Battery
white diagonal right and up arrow
Six Repower MM92 wind turbines (125m to tip), total capacity of 18MW & One Repower 5M wind turbine (163m to tip), total capacity of 5MW, Blyth Harbour, Northumberland

Wansbeck Blyth Harbour Wind Farm (Blyth Harbour re-powering)

Wind
white diagonal right and up arrow
49.9MWp Solar Farm and 17MVA Battery Energy Storage System, Near Rotherham
2023

Mere Flats Solar Energy Supply Project

Solar
Battery