Project Description

As part of a suite of applications prepared for Conrad Energy Limited, Engena provided the full planning application package, including the Planning Statement for a 10MW gas-fired standby generation facility at the Port of Felixstowe.

The generation facility will provide energy at times of peak electricity demand, through the UK Capacity Market. With the decline of large scale fossil-fuelled generation and a significant increase in renewable capacity on the grid, this project addresses the need for standby generation which is brought on-line during times of high consumer demand, and low renewables generation.

Notable Achievements

Careful and precise application preparation to meet the pressing needs of the Capacity Auction process.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
Single Enercon E44 wind turbine (67m to tip), total capacity of 500kW, Near Brechin, Angus
2014

Whitefield of Dunn

Wind
white diagonal right and up arrow
1.5MW Wind Turbine, 2.1MW Solar Array, 120MWh Battery Energy Storage System and EV Charging Station, Near Leighton Buzzard
2024

Astral Green Energy Park

Wind
Solar
Battery
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar