Project Description

Having supported Arnold White Estates to resolve issues with planning conditions at the neighbouring Double Arches wind turbine, the Engena team was commissioned to achieve planning consent for the tallest onshore wind turbine to be built in England (at the time) on adjacent land at Checkley Wood Quarry.

We proceeded with detailed site design, screening and environmental assessments for the Environmental Report which accompanied the planning application.

Following submission, support was provided throughout the determination of the project where the team resolved cumulative noise, visual and heritage concerns and presented to members of the planning committee. Engena is proud to have achieved local consent for our client, particularly given the large scale of the turbine, located within green belt. In addition the planning submission was post-publication of the governmental Written Ministerial Statement on onshore wind.

Despite significant objection to the project, Engena were able to demonstrate full compliance with all aspects of this restrictive statement.

Notable Achievements

  • Tallest onshore wind turbine to be built in England.
  • Consent in the Green Belt
  • Amplitude Modulation objections managed
  • WMS issues fully addressed

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
15MW, Rutherford Appleton Laboratory, South Oxfordshire

RAL Solar Array

Solar
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar
white diagonal right and up arrow
Combination of ground and roof mounted Solar Panels totalling 500kWp, Located in the south-west of Aylesbury Vale between Bicester and Aylesbury

Yeat Wood Solar

Solar