Project Description

Engena determined the parameters of the proposed project, including the design and specification of the array.

We then produced an Environmental Report detailing the potential effects of the proposal, coordinating and managing the planning application. We negotiated with the Local Planning Authority post submission to achieve mutually acceptable ecological enhancements and visual screening of the project, for the planning officers, developer and landowners.

Preparation of the planning application for the pilot cable to connect the development to the electricity grid.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
1.5MW Vensys VE87 Wind Turbine (143.5m to tip), Central Bedfordshire, on land adjacent to the operational Double Arches Wind Turbine

Checkley Wood Wind Energy

Wind
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar
white diagonal right and up arrow
Single 500kW Wind Turbine, 670kW Solar Array and 500kWh Energy Storage Facility, Welsh/English border, just north of Rhydycroseau (Wales) and 7km west of Oswestry (England)
2017

Cefn y Maes Renewable Energy Park

Wind
Solar
Battery