Project Description

Engena determined the parameters of the proposed project, including the design and specification of the array.

We then produced an Environmental Report detailing the potential effects of the proposal, coordinating and managing the planning application. We negotiated with the Local Planning Authority post submission to achieve mutually acceptable ecological enhancements and visual screening of the project, for the planning officers, developer and landowners.

Preparation of the planning application for the pilot cable to connect the development to the electricity grid.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
10MW (4 x 2.5MW) Gas Fuelled Electricity Generators, Port of Felixstowe, Suffolk

Felixstowe Capacity Market Infrastructure

Battery
Alternative
white diagonal right and up arrow
Nine Siemens SWT2.3-101 wind turbines (125m to tip), total capacity of 20.7MW., Dengie Peninsular, approximately 2km east of Southminster, Essex

Middlewick Wind Farm

Wind
white diagonal right and up arrow
1.9 MWp Solar Farm, Central Bedfordshire, near to Leighton Buzzard

Double Arches Solar

Solar