Project Description

Engena was involved with the Bloy’s Grove Solar Farm from the early stages of development. We built relationships with the landowner and Local Planning Authority and submitted requests for Pre-Application Advice, Screening and Scoping to South Norfolk District Council.

As part of the Environmental Impact Assessment (EIA), Engena assisted with public consultations including online webinars, in person parish meetings and site visits with local residents. The project faced several potentially limiting constraints including existing utilities infrastructure through the site, the adjacent railway line and local heritage. Engena collated the assessment findings to develop the site design and reported all matters in an Environmental Statement (ES).

Planning permission was granted by the Council’s Development Management Committee in June 2022. Since this time, Engena has supported EDF Renewables with ongoing assessments, particularly with regard to cultural heritage and highways matters, and for planning condition discharge ahead of construction, which commenced in 2025.

Alongside the solar farm application Engena has prepared a planning application for grid connection of the project to the Norwich South National Grid substation.

Notable Achievements

Successful consultations with the local community

Agreed trial trenching post determination.

Persisted to achieve feasible construction route accepted by the Highways officer.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
10MW (4 x 2.5MW) Gas Fuelled Electricity Generators, Port of Felixstowe, Suffolk

Felixstowe Capacity Market Infrastructure

Battery
Alternative
white diagonal right and up arrow
Total of 1500KW of Wind Turbines across three sites, Chesterfield, Barnsley & Doncaster

Energy Prospects and Harworth Estates Community Wind Turbines

Wind
white diagonal right and up arrow
Single 500kW Wind Turbine, 670kW Solar Array and 500kWh Energy Storage Facility, Welsh/English border, just north of Rhydycroseau (Wales) and 7km west of Oswestry (England)
2017

Cefn y Maes Renewable Energy Park

Wind
Solar
Battery