Project Description

Engena undertook an initial feasibility assessment to determine the parameters of the proposed project. This included the design and specification of the array.

We then produced an Environmental Report detailing the potential effects of the proposal, coordinating and managing the planning application on behalf of the landowner.

Consented at the local level by Planning Officer delegated powers, the solar farm is now operational.

Notable Achievements

Maximising output of the project through considered site design.

Preparing informative but proportional application documents for the scale of the proposal.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
Five Nordex N80 turbines (100m to tip) incorporated into 42MW Twinshiels Wind Farm., 3 km east of Laurencekirk, Aberdeenshire

Easter Tulloch Wind Farm

Wind
white diagonal right and up arrow
1.5MW Vensys VE87 Wind Turbine (143.5m to tip), Central Bedfordshire, on land adjacent to the operational Double Arches Wind Turbine

Checkley Wood Wind Energy

Wind
white diagonal right and up arrow
Single Enercon E44 wind turbine (67m to tip), total capacity of 500kW, Near Brechin, Angus
2014

Whitefield of Dunn

Wind