Project Description

Engena undertook an initial feasibility assessment to determine the parameters of the proposed project. This included the design and specification of the array.

‍

We then produced an Environmental Report detailing the potential effects of the proposal, coordinating and managing the planning application on behalf of the landowner.

‍

Consented at the local level by Planning Officer delegated powers, the solar farm is now operational.

Notable Achievements

Maximising output of the project through considered site design.

‍

Preparing informative but proportional application documents for the scale of the proposal.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
1.9 MWp Solar Farm, Central Bedfordshire, near to Leighton Buzzard

Double Arches Solar

Solar
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar
white diagonal right and up arrow
Nine Siemens SWT2.3-101 wind turbines (125m to tip), total capacity of 20.7MW., Dengie Peninsular, approximately 2km east of Southminster, Essex

Middlewick Wind Farm

Wind