Project Description

Engena worked with the assessment team to shape the proposed site design through the pre-submission stage of the project. We prepared a Screening Request document and, aided by our experienced approach to site visits, identified further considerations for the landscape and visual impact assessment.

Engena ensured the parameters and requirements of each aspect of the development were considered within the assessments supporting the project.

Engena prepared and submitted the Planning Application supported by an Environmental Report with Design and Access Statement and accompanying Figures, and a separate Planning Statement. Engena also assisted in the preparation of a Planning Performance Agreement with Doncaster Council. Doncaster Council’s Planning Committee granted permission for the project, located in Green Belt, in May 2023.

Engena is continuing to work with Climate ER to discharge planning conditions attached to the consent.

Notable Achievements

Local consent for a renewable energy development in Green Belt.

Enabled collaboration across the various environmental disciplines to evolve the site design, minimise site impacts and maximise benefits. Particular regard was given to public rights of way where paths used were not necessarily the paths mapped.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar
white diagonal right and up arrow
Six Repower MM92 wind turbines (125m to tip), total capacity of 18MW & One Repower 5M wind turbine (163m to tip), total capacity of 5MW, Blyth Harbour, Northumberland

Wansbeck Blyth Harbour Wind Farm (Blyth Harbour re-powering)

Wind
white diagonal right and up arrow
1.5MW Wind Turbine, 2.1MW Solar Array, 120MWh Battery Energy Storage System and EV Charging Station, Near Leighton Buzzard
2024

Astral Green Energy Park

Wind
Solar
Battery