Project Description

Engena undertook an initial feasibility assessment to determine the parameters of the proposed project. This included the design, layout within the landholding and specification of the array.

Engena scoped the development with North Devon District Council to determine the scope of work for Environmental Impact Assessment. As part of the EIA, Engena co-ordinated the public consultation process, designing and distributing site information brochures to the local community, and hosting a public exhibition.

Engena also managed the discharge of Conditions, including Non Material Amendment (NMA) and Minor Material Amendment (MMA) applications.

Notable Achievements

Management of a number of complex EIA assessments resulting in minimised visual impact through iterative site design.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
Single Enercon E44 wind turbine (67m to tip), total capacity of 500kW, Near Brechin, Angus
2014

Whitefield of Dunn

Wind
white diagonal right and up arrow
1.9 MWp Solar Farm, Central Bedfordshire, near to Leighton Buzzard

Double Arches Solar

Solar
white diagonal right and up arrow
Total of 1500KW of Wind Turbines across three sites, Chesterfield, Barnsley & Doncaster

Energy Prospects and Harworth Estates Community Wind Turbines

Wind