Project Description

Engena undertook an initial feasibility assessment to determine the parameters of the proposed project. This included the design, layout within the landholding and specification of the array.

‍

Engena scoped the development with North Devon District Council to determine the scope of work for Environmental Impact Assessment. As part of the EIA, Engena co-ordinated the public consultation process, designing and distributing site information brochures to the local community, and hosting a public exhibition.

‍

Engena also managed the discharge of Conditions, including Non Material Amendment (NMA) and Minor Material Amendment (MMA) applications.

Notable Achievements

Management of a number of complex EIA assessments resulting in minimised visual impact through iterative site design.

Drive Your Renewable Energy Project

Our end-to-end consultancy services are designed and proven to secure planning consent and deliver renewable energy assets across England, Scotland and Wales.

Similar Projects

View all projects
white diagonal right and up arrow
49.9MWp Solar Farm, South of Norwich, Norfolk
2025

Bloy's Grove Solar Farm

Solar
white diagonal right and up arrow
Total of 1500KW of Wind Turbines across three sites, Chesterfield, Barnsley & Doncaster

Energy Prospects and Harworth Estates Community Wind Turbines

Wind
white diagonal right and up arrow
Six Repower MM92 wind turbines (125m to tip), total capacity of 18MW & One Repower 5M wind turbine (163m to tip), total capacity of 5MW, Blyth Harbour, Northumberland

Wansbeck Blyth Harbour Wind Farm (Blyth Harbour re-powering)

Wind